Login Area

Close Login

Login

Contractors Home / Contractors

MARINE CONTRACTORS

Marine Contractor specialist for Marine Construction and Dock Maintenance and Repair Works. Since 2000, we have participated on all the largest Container Terminals Construction as Sub Contractors and since 2008, as Main Contractors for several New Marine COnstruction Projects and Existing Marine Infraestructure Repairs and Maintenance. We are registered at the Civil and Architectual Panama Inspection Board, and have a full Civil Engineering and Ports and Canals Engineering Staff.

VIEW MEC Marine Contractors Flyer

CONTRACTORS SERVICES

Marine Construction
Fabrication of Mooring Buoys (MBM's)
Fabrication of Floating Pontoons
Fabricarion of Working Barges
Construction of Piers and Marinas
Construction of Multipurpose Docks
Seawater intake pipe line installation
Discharge Pipe line installation
Fabrications and installation of doles
Construction of launching ramp
Construction of multipurpose ramp
Buoys, chain and anchor installation
Mooring dolphins and bollards
Installation of submarine Pipes
Grain Hooper Fabrication
Maintenance and Repair Marine Works
Marine fender installation
Cleat Installation-Bollards
Pipe Repairs
Port Infrastructure and Slab Repairs
Paint Scheme application and Sand Blasting of Piles
Dry Dock Pontoon Repairs
Pile Removal
Fender Removal
Shore Power Repairs and Upgrades
Fire Fighting Systems Installation
Rail Systems Repairs and Replacement
Transfer Systems Repairs
Fuel Pipe Repairs and Replacement
Zinc & Aluminum Anodes Underwater Replacement
Marine Concrete Structures Demolition

PROJECTS REFERENCES

GRAIN HOOPERS

Engineering, Procurement and Construction of two Grain Hoopers for the Panamax Terminal "Desarrollo Posicional". Deliverd and Succesfully in Operation Since 2006.

MGO, MDO & JET FUEL PIPING SYSTEM

Construction of Comissioning of Pump Station and 4 km of Pipes for MGO, MDO and Jet Fuel. Delivery and Succesfully in Operation Since 2003

PTP MBM EPC - VLCC MOORING SYSTEM

Engineering, Procurement and Construction of an Multi Buoy Mooring System, for VLCC Product Tankers. Delivered and Succesfully in Operation Since 2012

FLOATING PONTOON CREW DOCK

Engineering, Procurement and Construction of Floating Pontoon Crew Dock for Oil Tanking Taboguilla Terminal. Delivered and Succesfully in Operation Since 2010.

CHEVRON NORTH DOCK

Fender System Renewed, Dock Pilings Permanent Repaired, Main Dock Caissons Maintained, Catoding Protection Renewed. Deliverd and Succesfully in Operation Since 2012.

FLOATING PONTOON CREW DOCK

Engineering, Procurement and Construction of Floating Pontoon Crew Dock for Decal Oil Terminal at Taboguilla Island. Delivered and Succesfully in Operation Since 2013.

GUNA YALA PASSENGER DOCKS CONSTRUCTION

Engineering, Procurement and Construction of seven (7) passenger docks along the cost of Guna Yala Reservation. Delivered and Succesfully in Operation Since 2013.

BALBOA DRY DOCK PIER 12 REPAIRS

Engineering Studies for the Renovation of Capacity for Pier 12 at Balboa Dry Docks. Fendering System Renewed, Dock Pilings Permanent Repaired, Concrete Deck Repaired. Delivered and Succesfully in Operation Since 2013.

FLOATING EQUIPMENT

In addition to the Afloat Division Barge, Tug and Work boats, Contractors have the following Marine Equipment:

MEC PILE DRIVER
Pile Driving Barge with 40 foot in lenght and read more.
SECOND EQUIPMENT
Second description.
Image
Image
Image
Image
Image

Confirmation

Execution

Success